Completing of extrusion line including accumulator, dancer and caterpillar
completed in August 2024
Baskets for wire
completed in June 2024
Cooling trough for cooling of extruded hydraulic hoses
completed in June 2024
Cooling box
completed in May 2024
Rewinding line
completed in May 2024
Traversing take-ups 3900
completed in April 2024
Traversing pay-offs 3200
completed in April 2024
Dismantling of stranding line
completed in March 2024
Relocation of extrusion line
completed in March 2024
Collector rings for stranding machine
completed in January 2024
Drawing line installation
completed in January 2024
Automatic double take-up for Cu wire
completed in January 2024
Pay-off places for spools dia. 500 and 630 mm
completed in December 2023
Cooling trough – entering section
completed in December 2023
Taping unit
completed in December 2023
Switch for granulate distribution
completed in December 2023
Rewinding line upgrade, spools 4,3 m
completed in December 2023
Dismantling of drawing line
completed in December 2023
Double take-up for wire
completed in November 2023
Certificated contact-less measuring unit for cables
completed in November 2023
Drying unit for conductors dia. 1 – 6 mm, 1000 m/min
completed in November 2023
Combined accumulator with dancer
completed in November 2023
Half-belt caterpillar
completed in September 2023
Dancer + accumulator in extrusion line
completed in September 2023
Screening line upgrade
completed in August 2023
Traversing take-ups 3900
completed in May 2023
Simple rewinding line for cables
completed in May 2023
Traversing pay-off 3200
completed in May 2023
Double overhead pay-off 800
completed in March 2023
Triple overhead pay-off 800
completed in March 2023
Take-up for scrap wire
completed in March 2023
Complete CV line – tangential pay-off 530-1000
completed in March 2023
Complete CV line – double overhead pay-off 630-1000
completed in March 2023
Complete CV line – half-belt caterpillar, extruder, line control panel
completed in March 2023
Complete CV line – sliding entry into steam pipeline
completed in March 2023
Complete CV line – steam pipeline, cooling trough, drying, measuring units Zumbach
completed in March 2023
Complete CV line – transfer-wheel box, drying
completed in March 2023
Complete CV line – half-belt caterpillar with dancer
completed in March 2023
Complete CV line – accumulator
completed in March 2023
Complete CV line – double take-up with common traversing, feeding caterpillar and cutting
completed in March 2023
Double overhead pay-off 800
completed in February 2023
Portal take-ups 3200
completed in February 2023
Auxiliary drives for cylinders of varnishing line
completed in January 2023
Assembly of gravimetric systems to 4 extrusion lines
completed in December 2022
Adjustable stand for measuring head Zumbach
completed in December 2022
Double take-up for Festo-tubes
completed in December 2022
Longitudinal tape-aplication
completed in November 2022
SZ strander
completed in November 2022
Relocation of extrusion line
completed in November 2022
Relocation of tinning line
completed in November 2022
Cooling trough 3 – 25 mm
completed in September 2022
Ferris wheels 4,5 m
completed in September 2022
Traversing pay-off with dancer
completed in September 2022
Double take-up
completed in August 2022
Stand for capacitance measuring device
completed in August 2022
Conclusion of line for pastries-production – packaging
completed in July 2022
Cooling box
completed in July 2022
Upgrade of extrusion line
completed in May 2022
Product guiding in front of traversing take-ups
completed in May 2022
Drying unit for conductors dia. 1 – 6 mm, 1000 m/min, 3 pieces
completed in May 2022
Relocation of extrusion line
completed in May 2022
Drying unit for conductors dia. 3 – 15 mm, 300 m/min
completed in May 2022
Relocation of extrusion line
completed in April 2022
Relocation of extrusion line
completed in April 2022
Horizontal accumulator with dancer
completed in April 2022
Relocation of extrusion line
completed in February 2022
Accumulator + dancer + caterpillar in extrusion line
completed in January 2022
Traversing take-up 1600, 2 pieces
completed in January 2022
Set of jump rings for strander
completed in December 2021
Set of jump rings for strander
completed in December 2021
Dancer accumulator in extrusion line
completed in December 2021
Special caterpillar Niproll
completed in December 2021
Drying unit for conductors dia. 1 – 7 mm
completed in November 2021
Disassembly of older extrusion line
completed in November 2021
Drying unit for conductors dia. 15 – 65 mm
completed in October 2021
Bridge for granulate pipeline
completed in September 2021
Control system for cable extrusion line
completed in September 2021
SZ stranding machine
completed in September 2021
Special caterpillar Infeed
completed in September 2021
Installation of second-hand ten wire drawing line Niehoff
completed in September 2021
Installation of second-hand sixteen wire drawing line Niehoff
completed in September 2021
Stationary pay-off places for spools dia 1250 mm
completed in September 2021
Installation of second-hand eight wire drawing line Niehoff
completed in September 2021
Installation of second-hand double-twist bunching machine
completed in September 2021
Double take-up
completed in August 2021
Drying unit
completed in August 2021
Dancer
completed in August 2021
Dancer “light” za odviják
completed in August 2021
Extrusion line for production of cable inserts
completed in August 2021
Wheel-caterpillar
completed in August 2021
Pay-off – shears type 1600
completed in August 2021
Pay-off for cord
completed in August 2021
Straight water cooling trough
completed in August 2021
Drying unit for conductors dia. 6 – 30 mm
completed in July 2021
Simple rewinding line for cables
completed in June 2021
Double take-up for Festo-tubes
completed in June 2021
Accumulator to Double take-up for Festo-tube
completed in June 2021
Repair of drumtwister Stolberger – broken arm
completed in June 2021
System of conveyors for boxes
completed in May 2021
Double take-up for optical conductors + accumulator + dancer
completed in April 2021
Portable take-up for cables with length measuring unit
completed in April 2021
Removal of PUR-panel walls
completed in February 2021
Saw for cuttion of aluminium parts
completed in February 2021
Cable rewinding line
completed in February 2021
Heating tank for chocolate
completed in February 2021
Distributor and control software for homogenizator
completed in February 2021
Removal of cooling chamber
completed in January 2021
Removal of heating furnace
completed in January 2021
Spooler for wire dia. 0,9 – 1,6 mm, speed 20 m/s
completed in December 2020
Drying unit for conductors dia. 1 – 7 mm
completed in December 2020
Taping line from second-hand machines
completed in October 2020
Drying unit for cables dia. 30 – 160 mm.
completed in October 2020
Special milling machine
completed in September 2020
Pay-off (turntable) for Al wire
completed in September 2020
Set of jump rings for strander
completed in September 2020
Belt caterpillar for insulating extrusion line
completed in September 2020
Traversing take-up 2600
completed in September 2020
Rewinding line from second-hand machines
completed in August 2020
Fabric feeder for sewing machine
completed in August 2020
Stationary take-up for coils dia. 630 mm
completed in July 2020
Pay-offs for coils dia. 150 – 630 mm with dancers
completed in July 2020
Half-belt caterpillar + dancers, accumulator
completed in July 2020
Cooling trough
completed in July 2020
Complete extrusion line for cable production
completed in July 2020
Wire cleaning before extrusion of outer shell
Measuring and cutting table for rewinding line
completed in June 2020
Rewinding line from second-hand machines
completed in June 2020
Ferris wheels
completed in April 2020
Cart for pump
completed in April 2020
Machine for heating mats production IX.
completed in March 2020
Heated entering section of the cooling trough
completed in March 2020
Machine for heating mats production
completed in January 2020
Pay-off for cord
completed in January 2020
System of conveyors and lifts for boxes
completed in January 2020
Traversing for drumtwister
completed in December 2019
Special cylinder-capstan for line Beam
completed in November 2019
Components for line Beam
completed in November 2019
Telescopical cooling through
Complete reconstruction of the double take up
completed in October 2019
Rewinding line ČEZ – HK
completed in September 2019
General ovehaull of double twist cabling machine
completed in August 2019
Assembly line for leaf springs
completed in August 2019
Assembly line for leaf springs
completed in August 2019
Cleaning of baking plates
Drying unit for hydraulic with automatic lift
completed in August 2019
Combination surface drying
Haul off
completed in May 2019
Ferris Wheels
completed in December 2018
Double take-up
completed in December 2018
Cooling trough
completed in November 2018